Every trench we dig, every column we cage, every street we pave carries our name behind it — quietly, permanently, and to code.
From the bazaars of Chishtian to the foundations of Bahawalpur, Zaheer Abbas & Co. turns rough ground into lasting infrastructure.
Zaheer Abbas & Co. is a Pakistan Engineering Council–registered constructor and operator firm working out of Bahawalnagar, Punjab. Our crews are the ones knee-deep in the trench, tying rebar on a July afternoon, staying until the last paver is set straight.
Under Managing Partner Haris Ahmad Zaheer and Partner Zaheer Abbas, the firm has carried out road, drainage, water supply, and general building work across Chishtian and the wider Bahawalnagar district — work that is verified, licensed, and built to last.
More About Us
Bazaar footpaths to full road surfaces, laid and compacted to hold up under daily foot and vehicle traffic.
Column cages, slabs, and brickwork raised with proper reinforcement from foundation to roof.
Pipeline laying, trenching, and brick-lined wells that keep a neighbourhood's water moving where it should.
Work verified by the Pakistan Engineering Council, carried out by engineers whose names you can look up — not a claim on a brochure.
Zaheer Abbas & Co. began, as most contracting firms in Punjab do, with a small crew and a willingness to take on the jobs no one else wanted to start early or finish properly. Today the firm operates as a registered Constructor/Operator with the Pakistan Engineering Council — a distinction that separates a signboard business from an accountable one.
Headquartered at H.No. 311, St. No. 8, Gulberg Town, Bahawalnagar, we have built in the bazaars and side-streets of Chishtian: laying interlocking pavers in Rail Bazaar, running water pipelines through Main Bazaar, raising brick-lined wells, and casting reinforced columns that hold up new construction across the district.
Our license, engineers, and scope of work are all on the public PEC record — not a claim on a business card. Verify us on PEC ↗
License Sr. 644691, valid through 30 June 2027, registered as a Constructor/Operator firm under PEC. View verification ↗
H.No. 311, St. No. 8, Gulberg Town, Bahawalnagar — the firm's address on file with PEC.
Approved across roads, civil engineering, water supply, electrical, mechanical, and building restoration.
Overseeing the firm's day-to-day project execution and engineering standards, with an active PEC registration as a Civil Engineer.
The firm's namesake partner, whose standing in Chishtian's contracting community has anchored the business since its earliest projects.
Every engineer below holds an active PEC membership card — verified on the PEC public portal ↗.
| PEC Reg. No. | Engineer | Card Valid Until | Status |
|---|---|---|---|
| ELECT/18233 | Engr. Muhammad Tariq Nazar | 31 Dec 2026 | Valid |
| MECH/58128 | Engr. Salman Ahmed | 31 Dec 2027 | Valid |
| CIVIL/62672 | Engr. Haris Ahmad Zaheer | 31 Dec 2026 | Valid |
PEC Specialization Codes C2/4463 — 37 categories across civil, electrical, mechanical, and building works.
Every service below reflects work we have actually carried out on the ground — not a stock list copied from another contractor's site.
We lay and compact road surfaces and interlocking paver blocks for bazaars, streets, and public spaces. Our crews level, bed, and set each course by hand for a tight, even finish that won't shift underfoot — as you can see in our Rail Bazaar work in Chishtian.
From footing to roof, we tie and cage reinforcement steel to drawing specification before a single batch of concrete goes in. The reinforcement work is where a building's real strength is decided — and where we spend the most care.
Our masons build load-bearing brick walls integrated with RCC beams and columns, finished with properly shuttered and cured concrete slabs. The result is a structural shell that's ready for the next trade — square, level, and sound.
We trench, bed, and lay water supply and sewerage pipelines along bazaar roads and residential streets, connecting new infrastructure without disrupting the community longer than necessary. Every pipeline is laid to grade.
For sites that need their own water source or storage, we build brick-lined wells and retaining structures by hand, coursing and rendering the brickwork below ground the same way we would a visible wall above it.
Our carpentry crews build timber shuttering to hold concrete pours true while they cure, then strip and finish the exposed beams, slabs, and columns beneath. Unglamorous but critical — it decides whether the finished structure comes out straight.
Beyond individual buildings, we take on public-facing structures — bazaar entrance gates, welcome arches, and civic installations — that need to be structurally sound as well as presentable, built from the footing up.
Repair and structural conservation on existing buildings, bringing ageing structures back to a safe, usable standard.
Solar power system installation alongside low-voltage electrical and lighting works for residential and commercial sites.
Waterproofing, slope protection, landscaping, and general site development rounding out a completed project.
On-site photographs from our recent projects: residential buildings in Bahawalnagar district, paving works across Chishtian's bazaars, and utility works in Main Bazaar and Chaman Bazaar.

Brick walls raised between cast columns across the full perimeter, openings formed, rebar starter bars rising for the next floor.

Arched doorway openings built in brick — a detail that takes longer than a straight lintel but lasts long past the first coat of paint.

Arched window openings, cast columns, and brick walls moving up course by course — a wider project photographed from the perimeter on a September morning.

Management walking the project length with the work crew and local stakeholders — the kind of visit that catches a misalignment before it becomes a defect.

Discussing scope and sequence on the street where the work is happening — decisions made at the location they affect, not over the phone.

A finished pavement surface with interlocking coloured blocks, bedded flat and ready for foot traffic from day one.

Coloured pavers going down across a busy bazaar street, compactor in frame — the work done without shutting the market down longer than necessary.

Pavers sorted by colour and pattern before laying begins — the preparation a clean, aligned finished surface depends on entirely.

A welcome gate taking shape in Main Bazaar — brick piers, rebar cage, and concrete mixer all in frame as the structure rises from the footpath.

Pipeline sections laid to grade along a street trench, jointed and bedded before the road surface goes back above it.

A pipe connection point at the trench base — the detail that gets inspected on site before the excavation closes over it permanently.

A mason building the brick base of a manhole chamber while the street stays open above — precision work done in a hole the size of the man doing it.

Trench open, junction fittings positioned, tools laid out — the window between excavation and backfill where everything has to be right.

Trench opened, pipe bedded and ready for backfill — work that keeps water moving under a street for decades when done right.

Concrete poured into a brick-formed column directly from a transit mixer — everything has to be ready before the drum stops turning.

A tightly tied rebar cage lowered into its footing — the steel skeleton a multi-storey structure will rise from.

A pad footing freshly struck from its brick shutter, starter bars sitting plumb — everything above this depends on this being level.

A cast staircase with plastered walls rising to a landing — the structure is standing, light coming through from outside.

The staircase photographed from the landing above, treads still rough from the shutter — structural geometry visible before render covers everything.

Formwork stripped to reveal a clean beam-and-slab junction — the geometry that stays hidden once plastered but carries everything above it.

A grid of timber props holding a fresh slab through its cure — done before the concrete even arrives, this is what keeps the structure straight.

Brick infill walls between columns on an upper floor, full height, laid to plumb. The debris will be cleared before the next trade moves in.

Room partition walls rising inside an RCC frame — turning a concrete shell into a floor plan, one course at a time.

A mason tying wire through a rooftop reinforcement grid three storeys up — patient detail work that holds a parapet wall together in a Punjab summer.

Coursing brick by hand in an excavated shaft — the below-ground work nobody ever sees once done, but everyone relies on when they turn the tap.
We work on civil, road, and building projects on an ongoing basis. Reach out directly to discuss your requirements.
Reach out with your project details — a road, a building, a pipeline — and we'll get back to you with next steps.
Bahawalnagar, Punjab, Pakistan
Valid through 30 June 2027. Verifiable on the PEC public portal.